Project
OVERSEAS PROJECT

| CLIENT | BIOFORTE-LAB LLC |
| PROJECT | 10 kTPA Methanol-to-Feed Protein Production PLANT in Russia |
| LOCATION | Russia |
| COMPLETION | In Progress |
| PRODUCTION | – Feed Protein |
| WORK SCOPE | Basic Design |
| TECHNOLOGY | Methanol-to-Feed Protein |

| CLIENT | Luyuan des Mines Congo |
| PROJECT | Engineering Design for Caustic Soda Plant |
| LOCATION | Pointe-Noire, Republic of the Congo |
| COMPLETION | In Progress |
| PRODUCTION | – 32% Liquid Caustic Soda – 50% Liquid Caustic Soda – 98.5% Caustic Soda Flakes – 31% Hydrochloric Acid – 12% Sodium Hypochlorite |
| WORK SCOPE | Basic Design and Detailed Design |
| TECHNOLOGY | The process adopts ceramic membrane filtration for primary brine purification, chelating resin towers for secondary brine treatment, high-current-density natural-circulation bipolar ion-exchange membrane electrolyzers for electrolysis, and three-in-one synthetic furnaces for hydrochloric acid synthesis. The caustic soda evaporation and flaking section employs a "double-effect evaporation + pre-concentration + final concentration" process. |

| CLIENT | CF ASIA SDN. BHD. |
| PROJECT | 200TPD (1st PHASE-100TPD) CAUSTIC SODA PROJECT |
| LOCATION | Kawasan Perindustrian Gebeng Fasa 3, Kalangam Sub-District, Kuantan City, Pahang State, Malaysia |
| COMPLETION | 2025~2026 |
| PRODUCTION | – 32% Liquid Caustic Soda – 48.5% Liquid Caustic Soda – 35% Hydrochloric Acid – Liquid Chlorine |
| WORK SCOPE | Basic Design |
| TECHNOLOGY | The process adopts ceramic membrane filtration for primary brine purification, chelating resin towers for secondary brine treatment, high-current-density natural-circulation bipolar ion-exchange membrane electrolyzers for electrolysis, and three-in-one synthetic furnaces (without steam byproduction) for hydrochloric acid synthesis. The evaporation section employs a triple-effect evaporation process. |

| CLIENT | SUMEC Complete Equipment & Engineering Co., Ltd. |
| PROJECT | Caustic Soda, PVC, and Auxiliary Utilities |
| LOCATION | Shymkent, Republic of Kazakhstan |
| COMPLETION | In Progress |
| PRODUCTION | – SG3 to SG8 Homopolymer General-Purpose PVC Resin |
| WORK SCOPE | Detailed Design |
| TECHNOLOGY | The process incorporates dry-process acetylene production from calcium carbide, 98% concentrated sulfuric acid drying, gold-based catalyst for VCM synthesis (with heptane heat exchange), 105 m³ jacketed PVC polymerization reactors, a negative-pressure stripping column with overflow weir, and fluidized bed drying technology. |

| CLIENT | Bluestar (Beijing) Chemical Machinery Co., Ltd. |
| PROJECT | 770,000 t/a Caustic Soda Production Project |
| LOCATION | India |
| COMPLETION | 2022~2024 |
| PRODUCTION | – 32% caustic soda – 50% caustic soda – 98.5% Caustic Soda Flakes – Hydrogen Chloride Gas – Liquid Chlorine – Sodium Hypochlorite |
| WORK SCOPE | Basic Engineering Design |
| TECHNOLOGY | Adopting the ion-exchange membrane electrolysis process from Bluestar (Beijing) Chemical Machinery Co., Ltd. |

| CLIENT | Russia TSC DCC |
| PROJECT | Russia TSC 40 KTPA Chlorine Gas And 30,000tpa Epichlorohydrin Integration Project |
| LOCATION | Russia |
| COMPLETION | 2021~2023 |
| PRODUCTION | – Epichlorohydrin – Chlorine |
| WORK SCOPE | Basic Design |
| TECHNOLOGY | Ion-Exchange Membrane Electrolysis |

| CLIENT | DEJENA Chemical Engineering PLC |
| PROJECT | 50 KTPA Caustic Soda Project |
| LOCATION | Mekelle, Ethiopia |
| COMPLETION | 2016~2018 |
| PRODUCTION | – Caustic Soda – Polyvinyl Chloride |
| WORK SCOPE | Basic Design |
| TECHNOLOGY | Ion-Exchange Membrane Electrolysis |

| CLIENT | Bluestar (Beijing) Chemical Machinery Co., Ltd. |
| PROJECT | 30,000 t/a Caustic Soda Turnkey Project |
| LOCATION | Bangladesh |
| COMPLETION | 2017~2018 |
| PRODUCTION | – Caustic Soda Flakes – 31% Hydrochloric Acid – 10% Sodium Hypochlorite – Liquid Chlorine |
| WORK SCOPE | Basic Design and Detailed Design |
| TECHNOLOGY | Adopting the ion-exchange membrane electrolysis process from Bluestar (Beijing) Chemical Machinery Co., Ltd. |

| CLIENT | Beijing Xingdie Equipment Engineering Technology Co., Ltd. |
| PROJECT | 150,000 t/a Chlorine Turnkey Project |
| LOCATION | Coatzacoalcos Plant Industrial Park, Veracruz, Mexico |
| COMPLETION | 2020~2022 |
| PRODUCTION | – 50% Liquid Caustic Soda – 31% Hydrochloric Acid – 10% Sodium Hypochlorite – Chlorine – Hydrogen |
| WORK SCOPE | Basic Design and Detailed Design |
| TECHNOLOGY | Adopting the ion-exchange membrane electrolysis process from Bluestar (Beijing) Chemical Machinery Co., Ltd. |
